Section I-1
Project Delivery Systems

There are a wide range of delivery systems available to Owners embarking on a design or construction project. Some are more appropriate to a particular project type and some are more appropriate to a particular Owner. Some are not, in the opinion of the Joint Committee, appropriate for any project.

Every project has a series of stages through which it passes. Different project delivery systems allow for different levels of participation by the Owner in these various phases. Following this introductory section are detailed descriptions of numerous project delivery systems where recommendations are made for the selection of the design professional, the constructor and for the structure of the design team, based on the attributes of the project and desired level of participation in or control of the process by the Owner.

The following are some of the issues which need to be evaluated by the Owner when determining which delivery system should be selected.  They will be addressed in detail within the sections on each delivery system.

Project type:

  • Size

  • Complexity

  • Schedule

  • Budget

  • Repetitive / prototypical

  • One time construction project or part of an overall master plan

  • Part of a campus or a stand-alone structure

  • Site conditions

  • Budget-driven

  • Signature building

Owner:

  • Public or private

  • Familiarity with construction

  • Staff available for input during design

  • Staff available for input / oversight during construction

Design professional:

  • Familiarity with Owner / facility

  • Familiarity with project type

  • Staff available

  • Compatibility with Owner’s and Constructor’s team

  • One-time project or long-term commitment

Constructor:

  • Familiarity with Owner / facility

  • Familiarity with project type

  • Staff available

  • Compatibility with Owner’s and Design professional’s team

  • One-time project or long-term commitment

 

Reviewed March 2011